330ml 500ml 1500ml Plastic Glass Pet Bottle Automatic Drinking Mineral Sparkling Pure Water Liquid Alcohol Wine Beverage Filling Making Bottling Machine
Basic Info.
Model NO. | CGF32-32-10 |
Feed Cylinder Structure | Multi-Room Feeding |
Dosing Device | Surface Type |
Filling Principle | Atmospheric Pressure |
Packaging Container Lifting Structure | Chute Lifting |
Structure | Rotary |
Packaging | Bottle |
Packaging Material | Plastic |
Usage4 | Bottle Water |
Speed5 | 20000bph to 22000bph |
Speed4 | 15000bph to 18000bph |
Usage3 | Sparkling Water |
Usage7 | Aqua Water |
Usage8 | Spring Water |
Usage6 | Soda Water |
Usage5 | Drink Water |
Speed2 | 6000bph to 8000bph |
Usage1 | Mineral Water |
Speed3 | 10000bph to 12000bph |
Usage2 | Pure Water |
Bottle Type | Pet/Glass/PE |
Control | PLC(Simens/Mistsubishi) |
Speed1 | 3000bph to 5000bph |
Transport Package | Wooden Case |
Specification | 2850*2150*2700mm |
Trademark | Sky Machine |
Origin | Jiangsu Province |
HS Code | 8422301090 |
Production Capacity | 50sets/Year |
Product Description
Complete Drinking Mineral Water Filling Processing Plant MachineryProduct Description
Beverage Machinery-Equipment characteristics:
3-in-1 filling monoblock, combined with rinsing, filling and capping. It is innovated and designed in the requirement of still pure water and mineral water, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy.
1. Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier. 2. Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough.. 3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution. 4. High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose. 5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.
Flow Chart
Rinser:- The rotary wheel is a fully stainless steel welded structure.
- The machine applies unique overturning bottle clamp, which is an innovation of our company. This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, this bottle clamp is hygienic and durable.
- The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water.
- All sliding bushes of lifting device use Igus (Germany) anti-corrosion maintenance free bearing.
- The rinser is driven by driving system positioned inside machine frame via gear transmission.
- Transfer starwheel
- Made of stainless steel of superior quality.
- Equipped with bottle jam protection device.
- Rotary wheel fully made of stainless steel SUS 304.
- Gravity filling method.
- Filling valves are made of SUS316L.
- Filling valves are reasonably structured with accurate filling.
- Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth.
- Level of cylinder is controlled with float-ball.
- Filler is driven through gears inside the machine frame.
- Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck.
Capper:Capper is the machine with highest precision, influence very much with the stability and reliability of the filling monoblock. Our capper features as follows:The equipment is designed and used the technology of Arol from Italy, most advance technology in the world, developed with the experience of asepsis filling machine. For example, I) extruding wheel (main part to control the stability when sealing), uses the technology of Arol. Kinematical and kinetic design of the wheel by experts improves the stability and credibility of the equipment. II) Sealing faucet (main part to control the credibility of sealing), is improved by experts with the design of alnico. Besides the magnetic contortion variation device, there is variation dial which makes variation more easily. The benefit of this design is not only it can set the contortion, but also it makes contortion more precise and credible, and reduces inferior.Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism.Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute.The capper is equipped with inlet bottle detection switch.Centrifugal way of cap arranging is adopted to reduce damage of caps.A cap inspecting system is applied to control on-off of elevator.
This Complete Mineral Water Filling Plant adopts bottle neck holding transmission technology to realize fully automatic rinsing,filling and capping.Most elements of the electrical system employ famous brand advanced products.Each machine element that contacts with the liquid is made of high quality stainless steel.They obtain the advantages of good abrasive resistance,high stability,low failure rate,etc The quality of the equipment reaches the international advanced level
Technical Parameter
Model | CGF 8-8-3 | CGF14-12-5 | CGF16-16-5 | CGF24-24-8 | CGF32-32-10 | CGF40-40-12 | CGF50-50-15 |
Capacity (BPH) | 1000-2000 | 3000-5000 | 6000-8000 | 8000-12000 | 12000-15000 | 16000-20000 | 20000-24000 |
Power supply | 1.5KW | 1.5 KW | 2.2 KW | 3 KW | 4 KW | 7.5 KW | 9.5 KW |
Overall dimension | 2000×1550×2650 | 2360×1770×2700 | 2760×2060×2700 | 2800×2230×2700 | 3550×2650×2700 | 4700×3320×2700 | 5900×4150×2700 |
Weight (KG) | 1100 | 2500 | 3500 | 4200 | 5500 | 6800 | 7600 |
Auxiliary Machine
1. Pure Water And Mineral Water Treatment Plant
0.25~100tons/hr with RO system
2. Drinking Water Bottling Plant
2000BPH~36000BPH(PET Bottle: 200ml to 2000ml)
400BPH~5000BPH(PET Bottle: 3L to 7L)
120BPH~2000BPH( PET Barrel: 10L to 5 Gallon)
3. Carbonated Drink Bottling Plant
2000BPH~22000bph (PET Bottle: 200ml to 2000ml)
4. Juice/Pulp Juice Bottling Plant
2000BPH~22000bph (PET Bottle: 200ml to 2000ml)
5. Beer, Vodka And Wine Filling Machine
2000BPH~20000bph (Glass Bottle: 500ml)
6. Can Filling Production Plant
2000BPH~20000bph (PET/ Aluminum Can: 330ml)
7. Vegetable Oil Bottling Plant
1000BPH~2500bph (PET Bottle: 5000ml)
3000BPH~10000bph (PET Bottle: 500ml)
8. PET Bottle Blow Molding Machine
Semiautomatic type: 2cavity and 4cavity
Automatic type: 2cavity, 4 cavity, 6 cavity and 8 cavity
Product Application
Company Profile
Our machine's parts are all from above excellent suppliers .We carefully select these suppliers to ensure that every part of our products has good quality.
Zhangjiagang Sky Machine Co.,ltd is located at Leyu Economic Development Zone of Zhangjiagang City. Our Company was founded in 2008. We committed to do the world's most competitive liquid drink packaging manufacture suppliers, Focus on Providing customers with safe, energy, saving, efficient equipment. And high quality, fast and personalized service. We sincerely invite businesses around the world to estabilish a professional relationship with us based on trust, benefits and the promising possibility for future development.
FAQ
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 15 years experience.Q2: Why is your prices higher than others?A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.Q3: What is your delivery time?A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.Q4: How to install my machines when it arrives? How much the cost?A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines Ifneeded.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.Q5: How long time for installation?A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.Q6: How about the spare parts?A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.Q7: What is your guarantee?A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.Q8: What is your payment term?A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also. |
Welcome you to contact with us!